Added 10,000 sf to and existing 4,000sf office. Addition included a paint booth and 10 ton bridge crane. Renovated existing restrooms and training room.
Flametec
- Post author:sysadmin
- Post published:September 6, 2005
- Post category:Manufacturing
Tags: Addition