Chattanooga Tractor Mahindra Shipping Facility
In 2013 MPL designed and built a 46,000-sf building for Chattanooga Tractor. 3 years later the owner came back to MPL. He had bought another
In 2013 MPL designed and built a 46,000-sf building for Chattanooga Tractor. 3 years later the owner came back to MPL. He had bought another
Added 28,000 sqft manufacturing bay to existing 290,000sf building. New bay was 48′ tall with four 60 ton bridge cranes. Building included numerous pits and
Renovated interior and exterior of 90 year old two story building in downtown Chattanooga. Worked to restore original ornament on façade. Updated interior serves as
Boyd Buchanan needed a new gym dedicated to wrestling and. MPL squeezed this gym into the land available. MPL matched the existing design aesthetic of
Woodbridge Foam bought a spec built warehouse and planned to convert it into manufacturing facility for a car seat foam. MPL worked with Woodbridge’s industrial
The Hwy 58 Fire Department has used an old school as their Training center for many years. Unfortunately the school was in sever disrepair. MPL
This was MPL’s third major addition to the existing Heatec building. Previously MPL added to the office and then added a Brand new production bay.
Renovated a low roof warehouse to serve as corporate office space for a Oil distributor. We took advantage of the existing building joists and floors
Renovate existing hanger, offices, restrooms, and meeting spaces for corporate jets hanger at Chattanooga Airport. The building was originally built by MPL in the 1970s