Astec Bay Addition
Added 28,000 sqft manufacturing bay to existing 290,000sf building. New bay was 48′ tall with four 60 ton bridge cranes. Building included numerous pits and
Added 28,000 sqft manufacturing bay to existing 290,000sf building. New bay was 48′ tall with four 60 ton bridge cranes. Building included numerous pits and
Woodbridge Foam bought a spec built warehouse and planned to convert it into manufacturing facility for a car seat foam. MPL worked with Woodbridge’s industrial
Boyd Buchanan needed a new gym dedicated to wrestling and. MPL squeezed this gym into the land available. MPL matched the existing design aesthetic of
The Hwy 58 Fire Department has used an old school as their Training center for many years. Unfortunately the school was in sever disrepair. MPL
This was MPL’s third major addition to the existing Heatec building. Previously MPL added to the office and then added a Brand new production bay.
MPL came to this job later then we typically do. The design was already done. MPL worked with the owner and an outside architect to
MPL renovated this building in 2012, and then in 2017 designed and built an addition which drastically changed the look and function of the building.
Colonial Chemical had outgrown their shipping facilities. MPL built an adjacent building with a covered connector to allow Colonial to stage and ship their orders.
Card Monroe relocated their research and development laboratory and office to a new wing of their factory in 2014. IN 2018 CMC returned to us
MPL renovated an existing building and added another to the site. ADM transfers sugar from rail to truck at this facility. The project included over